Extractor assembly for systems using FEI Sidewinder FIB column with max. 20nA beam current, such as:
Certus / CLM
Scios
Strata 400
V600
Consists of assembled extractor cap, beam acceptance aperture, sputter shield and housing.
We recommend a new extractor assembly be installed with each new 69Ga LMIS.
This item is a direct replacement for FEI p/n 4035 272 35971
相关产品
电话:+86-755-8889 3456
+86-136 8647 3456
邮箱:vip@3456f.com
投诉邮箱:v@3456f.com
地址:深圳市龙岗区吉华街道甘李六路12号中海信科技园13A栋1楼104-2
扫一扫
关注微信公众号